Case Study — Light Industrial & Warehousing
Light Industrial Refresh (Flooring + Striping + Electrical)
Home / Case Studies / Light Industrial Refresh
Overview
An operations team needed a floor and circulation refresh in active industrial space, including surface prep, striping updates, and targeted electrical corrections while keeping production flow protected.
Problem / Goals
- Floor markings were inconsistent across work zones.
- Surface wear and localized damage affected safety and clarity.
- Electrical corrections were needed in the same work windows.
- Operations required phased handoff without broad shutdowns.
Scope Included + Exclusions
Scope Included
- Floor prep and coating-ready surface correction in selected areas.
- Layout and application of striping based on approved traffic plan.
- Electrical corrections and fixture updates in designated zones.
- Phased turnover by zone with documented release checks.
Exclusions
- Major slab replacement or structural slab work.
- Process-equipment relocation outside approved scope.
- Unplanned production shutdown support unless approved as change order.
Work Window (hours/days)
Work was sequenced by zone during off-peak and controlled access windows, including night or weekend blocks where floor cure and line visibility needed protected turnover time.
Technical Approach (step-by-step)
- Confirm zone map, circulation plan, and electrical correction list.
- Prepare surfaces and isolate active production paths.
- Run striping layout checks with site representative before final application.
- Complete electrical corrections with required lockout controls.
- Release finished zones after visual and checklist verification.
Safety / Compliance (COI, permits if applicable)
- COI records maintained for any partner trade activity.
- Permits coordinated for electrical scope where required by local authority.
- Work-zone control, signage, and lockout procedures applied per site protocol.
Deliverables + Acceptance Criteria (photos, checklist, walkthrough signoff)
- Photo record of floor condition and final striping by zone.
- Completion checklist for flooring, striping, and electrical items.
- Walkthrough signoff confirming area release for operations.
Change Orders (written approval)
Any additional repair or scope expansion identified after kickoff was documented as a change order and required written approval before execution.
Closeout Pack (photos + checklist + signoff)
Final closeout package included zone photos, signed checklists, and walkthrough confirmation for operations and facilities records.